Dell PowerEdge 2900 Manual - Página 17
Navegue en línea o descargue pdf Manual para Servidor Dell PowerEdge 2900. Dell PowerEdge 2900 26 páginas. Tower-to-rack conversion guide
También para Dell PowerEdge 2900: Información sobre la instalación (11 páginas), Manual de instalación (14 páginas), Manual de instalación (10 páginas), Actualización (2 páginas)
Removing the Tower Front Plate
Using a T-10 Torx driver, remove the 29 screws that secure the tower front plate to the system chassis. See
Figure 1-5.
Figure 1-5. Removing the Tower Front Plate
1
tower front plate
Installing the Rack Front Plate
1 Using a T-10 Torx driver, install the 34 screws (that came in your kit) to secure the rack front panel to
the system chassis. See Figure 1-6.
NOTICE: Do not over-tighten the screws.
2 Attach the rack ear pieces to the system chassis.
Align the flanges of the right rack ear piece against the right side of the system chassis with the
a
upper flange of the piece inserted between the double walls on the chassis. See Figure 1-6.
Align the flanges with the screw holes and secure the ear piece with four 6-32 flathead Phillips
b
screws. See Figure 1-6.
NOTICE: Do not over-tighten the screws.
Repeat for the left rack ear piece.
c
2
2
M3 x 8 T10 Torx flathead screw
(29)
1
Tower-to-Rack Conversion Guide
15