Dell VEP4600 Manual de instalación - Página 12
Navegue en línea o descargue pdf Manual de instalación para Servidor Dell VEP4600. Dell VEP4600 23 páginas.
También para Dell VEP4600: Manual de instalación (40 páginas), Manual de instalación (40 páginas)
Before you install the switch into the dual-tray:
1
Cut the ground cable (not included) to the desired length. The cable length must
facilitate proper operation of the fault interrupt circuits. Use the shortest cable route
allowable.
2
Unscrew the two attached M3 screws and set aside.
3
Attach the ground lug and bracket to the switch using the M3 screws.
Figure 2. VEP4600 ground lug attached
4
Attach the other end of the ground cable to a suitable ground point such as the rack or
cabinet.
Rack or cabinet installation
You may either place the platform on a rack shelf or mount the platform directly into a 19"
wide, EIA-310- E-compliant rack.
The platform includes two-post rail assemblies.
WARNING:
This guide is a condensed reference. Read the safety instructions in
Safety, Environmental, and Regulatory information booklet before you begin.
your
12
VEP4600 installation