Dell VEP4600 Installatiehandleiding - Pagina 12

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell VEP4600. Dell VEP4600 23 pagina's.
Ook voor Dell VEP4600: Installatiehandleiding (40 pagina's), Installatiehandleiding (40 pagina's)

Dell VEP4600 Installatiehandleiding
Before you install the switch into the dual-tray:
1
Cut the ground cable (not included) to the desired length. The cable length must
facilitate proper operation of the fault interrupt circuits. Use the shortest cable route
allowable.
2
Unscrew the two attached M3 screws and set aside.
3
Attach the ground lug and bracket to the switch using the M3 screws.
Figure 2. VEP4600 ground lug attached
4
Attach the other end of the ground cable to a suitable ground point such as the rack or
cabinet.

Rack or cabinet installation

You may either place the platform on a rack shelf or mount the platform directly into a 19"
wide, EIA-310- E-compliant rack.
The platform includes two-post rail assemblies.
WARNING:
This guide is a condensed reference. Read the safety instructions in
Safety, Environmental, and Regulatory information booklet before you begin.
your
12
VEP4600 installation