Miele DA 219-2 Instrucciones de uso e instalación - Página 26
Navegue en línea o descargue pdf Instrucciones de uso e instalación para Campana de ventilación Miele DA 219-2. Miele DA 219-2 40 páginas. Ventilation system
También para Miele DA 219-2: Instrucciones de uso e instalación (44 páginas)
At a maximum distance of 365 mm
from the ceiling, hold retaining plate
C against the wall and use the not-
ches to align it with the middle line.
Mark the two drill holes.
Drill two 8 mm ø holes into the wall
and press the S8 plugs into the
holes.
Screw on retaining plate C with two
5 x 40 mm screws.
Before fitting the canopy the glass
cover of the lighting tube must first
be removed (see relevant section in
"Cleaning and care").
Hang the canopy on the angle
brackets on retaining plate A.
26
Secure the canopy. Secure the ca-
nopy with 5 x 40 mm screws into
each drilled hole.
DA 216-2 / EXT, 217-2:
Secure the canopy with a 5 x 40 mm
screw.
DA 219-2 / EXT:
Secure the canopy with two
5 x 40 mm screws.
Replace the glass cover.