Miele DA 219-2 Istruzioni per l'uso e l'installazione - Pagina 26
Sfoglia online o scarica il pdf Istruzioni per l'uso e l'installazione per Cappa di ventilazione Miele DA 219-2. Miele DA 219-2 40. Ventilation system
Anche per Miele DA 219-2: Istruzioni per l'uso e l'installazione (44 pagine)
At a maximum distance of 365 mm
from the ceiling, hold retaining plate
C against the wall and use the not-
ches to align it with the middle line.
Mark the two drill holes.
Drill two 8 mm ø holes into the wall
and press the S8 plugs into the
holes.
Screw on retaining plate C with two
5 x 40 mm screws.
Before fitting the canopy the glass
cover of the lighting tube must first
be removed (see relevant section in
"Cleaning and care").
Hang the canopy on the angle
brackets on retaining plate A.
26
Secure the canopy. Secure the ca-
nopy with 5 x 40 mm screws into
each drilled hole.
DA 216-2 / EXT, 217-2:
Secure the canopy with a 5 x 40 mm
screw.
DA 219-2 / EXT:
Secure the canopy with two
5 x 40 mm screws.
Replace the glass cover.