ALLpaQ Packaging Group Genesis 250 C Manual del operador - Página 7

Navegue en línea o descargue pdf Manual del operador para Equipos de envasado ALLpaQ Packaging Group Genesis 250 C. ALLpaQ Packaging Group Genesis 250 C 13 páginas.

ALLpaQ Packaging Group Genesis 250 C Manual del operador
2.2 Unfolding the container for use
When lifting the lid of a 1000 Litre container it is recommended that two people be involved in the
operation.
Fig 2.1
Lock the front and final sidewall into position (Fig 2.7).
Replace the lid in a reversal of the description see instruction 2.5 below (Fig 5.1).
2.3 Fitting port position plate to bag
ALLpaQ recommend that all 3D bags used in conjunction with it bioprocess range of containers
should be fitted with a small plastic support disc when filled. Some bags may be pre fitted with a
similar disc however if this is not the case please contact ALLpaQ immediately before use.
For full instructions refer to instruction 1.3
Fig 2.2
Fig 2.4
Fig 2.5
Fig 2.6
Fig 2.7
Manual V1 - (Sept 14
Fig 2.3
th
2012)
Hold and lift the
black handles at the
four corners of the
lid and move
towards the centre,
to the open position
(Fig 2.2).
Using both hands
pull the side panel
towards you to erect
the first sidewall (Fig
2.4).
Repeat this action
for the opposite
panel (Fig 2.5)
Complete the same
action with the rear
panel making sure
the wall clicks into
position (Fig 2.6)