Miller XT30i Manual del usuario - Página 21

Navegue en línea o descargue pdf Manual del usuario para Sistema de soldadura Miller XT30i. Miller XT30i 44 páginas.

Miller XT30i Manual del usuario

5-3. Connecting Gas/Air Supply

Tools Needed:
9/16 in.
.
Use only clean, dry air with 621 to 827
kPa (90 to 120 psi) pressure.
1
Gas/Air Inlet Opening
2
Hose

5-4. Connecting Work Clamp

2
.
A complete Parts List is available at www.MillerWelds.com
3
Teflon Tape
Obtain hose with 1/4 NPT right-hand
thread fitting. Wrap threads with teflon tape
1
1
3
From Gas/Air
Supply
(optional) or apply pipe sealant, and install
fitting in opening. Route hose to gas/air
supply.
.
Do not connect work clamp to
the portion of the workpiece
that will fall when cut.
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
OM-256 118 Page 17
2
257 249-B
Ref 803 915-A