Sharp SJ-21P-GY Manual de servicio - Página 22
Navegue en línea o descargue pdf Manual de servicio para Frigorífico Sharp SJ-21P-GY. Sharp SJ-21P-GY 28 páginas.
SJ-21P
SJ-D25P
(3) Installing of Evaporator
1. Install Evaporator as shown in Fig. A-22 in the
reverse order of Fig. A-23.
2. Correct the deformed fin.
NOTE
1. When installing Evaporator, take care not to
deform significantly and break the pipes.
2. Take care not to damage the lead wires and hurt
yourself by the fin of Evaporator.
Cooling unit
Mark: Refrigerant flow
Mark: Brazing portion
Hot pipe L
(Side condenser)
COOLING UNIT
Hot pipe
Hot pipe R
(DP-condenser)
(Side condenser)
Discharge P connector
Fig. C-1
Evaporator
Suction pipe
Capillary tube
Dryer
22
Back condenser
S.P connector
Compressor