Sharp SJ-21P-GY Instrukcja serwisowa - Strona 22

Przeglądaj online lub pobierz pdf Instrukcja serwisowa dla Lodówka Sharp SJ-21P-GY. Sharp SJ-21P-GY 28 stron.

Sharp SJ-21P-GY Instrukcja serwisowa
SJ-21P
SJ-D25P
(3) Installing of Evaporator
1. Install Evaporator as shown in Fig. A-22 in the
reverse order of Fig. A-23.
2. Correct the deformed fin.
NOTE
1. When installing Evaporator, take care not to
deform significantly and break the pipes.
2. Take care not to damage the lead wires and hurt
yourself by the fin of Evaporator.

Cooling unit

Mark: Refrigerant flow
Mark: Brazing portion
Hot pipe L
(Side condenser)
COOLING UNIT
Hot pipe
Hot pipe R
(DP-condenser)
(Side condenser)
Discharge P connector
Fig. C-1
Evaporator
Suction pipe
Capillary tube
Dryer
22
Back condenser
S.P connector
Compressor