Siemens SITRANS WW300 Manual de instrucciones - Página 13

Navegue en línea o descargue pdf Manual de instrucciones para Equipamiento industrial Siemens SITRANS WW300. Siemens SITRANS WW300 42 páginas. Weighfeeders
También para Siemens SITRANS WW300: Manual de instrucciones (28 páginas)

Siemens SITRANS WW300 Manual de instrucciones

Installing

Note
When lifting the weighfeeder, connect to the lifting points at the top of the unit, and follow
local governing code for lifting/hoisting.
Perform a thorough and systematic inspection of containers immediately upon receipt of your
Siemens weighfeeder. The containers are packed to separate each item and provide protection
during shipping.
Note
Do not remove equipment from shipping crates or boxes until you check for possible
shipping damage. Contact the carrier immediately if damage is noted.
Your weighfeeder has been designed, assembled, and factory tested for your specific
application.
Note
• The frame of the weighfeeder needs to be grounded to ensure accurate signal processing
to the integrator.
• Do NOT remove the tagged load cell shipping bolt(s) until the installation is complete to
prevent load cell damage.
• Do NOT weld on or near the weighfeeder while the load cell is connected to the electronic
integrator. Damage to the integrator may result if the load cell is not disconnected from
the integrator.
• Follow a scheduled, preventative maintenance program to ensure optimum performance
and long equipment life.
SITRANS WW300
Operating Instructions, 05/2015, A5E33560691-AB
4
11