Ricoh Container Stacker Instrucciones de desembalaje e instalación - Página 28
Navegue en línea o descargue pdf Instrucciones de desembalaje e instalación para Accesorios para impresoras Ricoh Container Stacker. Ricoh Container Stacker 49 páginas.
6. Close Front Cover R to allow you to see the gap between the Printer and
Container Stacker. Using the leveling bolts, adjust the height of the Container
Stacker until the Container Stacker frame projection is level with the Paper Guide
projection. Adjust the horizontal level of the Container Stacker by placing a level
on the stacker frame in the three locations shown. Tighten the screws completely.
Level
Front Cover L
:
NOTE
Refer to page 5 for instructions on opening Front Cover L.
7. Verify the gap at A, B, C, and D are nearly equal.
A
B
Stacker Frame
Projection
Leveling Bolts
Adjust the gap in parallel
Container Stacker Installation Instructions 1-23
Stacker Paper Guide
Same Height
Connection Part Details
C
D
Projection