- ページ 28

プリンターアクセサリー Ricoh Container StackerのPDF 開梱・設置手順をオンラインで閲覧またはダウンロードできます。Ricoh Container Stacker 49 ページ。

Ricoh Container Stacker 開梱・設置手順
6. Close Front Cover R to allow you to see the gap between the Printer and
Container Stacker. Using the leveling bolts, adjust the height of the Container
Stacker until the Container Stacker frame projection is level with the Paper Guide
projection. Adjust the horizontal level of the Container Stacker by placing a level
on the stacker frame in the three locations shown. Tighten the screws completely.
Level
Front Cover L
:
NOTE
Refer to page 5 for instructions on opening Front Cover L.
7. Verify the gap at A, B, C, and D are nearly equal.
A
B
Stacker Frame
Projection
Leveling Bolts
Adjust the gap in parallel
Container Stacker Installation Instructions 1-23
Stacker Paper Guide
Same Height
Connection Part Details
C
D
Projection