Cisco ASA 5516-X Manual de instalación del hardware - Página 24

Navegue en línea o descargue pdf Manual de instalación del hardware para Hardware de red Cisco ASA 5516-X. Cisco ASA 5516-X 32 páginas. Threat defense reimage guide
También para Cisco ASA 5516-X: Manual de inicio rápido (8 páginas), Manual de instalación sencilla (11 páginas), Manual de inicio rápido (9 páginas), Manual de software (37 páginas), Montar y conectar (6 páginas), Manual (14 páginas)

Cisco ASA 5516-X Manual de instalación del hardware

Site Considerations

experiencing shutdowns or unusually high error rates with your existing equipment, these considerations may
help you isolate the cause of failures and prevent future problems.
Site Considerations
Considering the following helps you plan an acceptable operating environment for the chassis, and avoid
environmentally caused equipment failures.
• Electrical equipment generates heat. Ambient air temperature might not be adequate to cool equipment
• Ensure that the chassis cover is secure. The chassis is designed to allow cooling air to flow effectively
• Always follow the ESD-prevention procedures described previously to avoid damage to equipment.

Power Supply Considerations

When installing the chassis, consider the following:
• Check the power at the site before installing the chassis to ensure that it is "clean" (free of spikes and
• Install proper grounding for the site to avoid damage from lightning and power surges.
• The chassis does not have a user-selectable operating range. Refer to the label on the chassis for the
• Install an uninterruptible power source for your site, if possible.

Equipment Rack Configuration Considerations

Consider the following when planning an equipment-rack configuration:
• If you are mounting a chassis in an open rack, make sure that the rack frame does not block the intake
• Be sure enclosed racks have adequate ventilation. Make sure that the rack is not overly congested as
• In an enclosed rack with a ventilation fan in the top, heat generated by equipment near the bottom of
• Baffles can help to isolate exhaust air from intake air, which also helps to draw cooling air through the
Cisco ASA 5508-X and ASA 5516-X Hardware Installation Guide
20
to acceptable operating temperatures without adequate circulation. Ensure that the room in which you
operate your system has adequate air circulation.
within it. An open chassis allows air leaks, which may interrupt and redirect the flow of cooling air from
the internal components.
Damage from static discharge can cause immediate or intermittent equipment failure.
noise). Install a power conditioner, if necessary, to ensure proper voltages and power levels in the
appliance input voltage.
correct appliance input-power requirement.
or exhaust ports.
each chassis generates heat. An enclosed rack should have louvered sides and a fan to provide cooling
air.
the rack can be drawn upward and into the intake ports of the equipment above it in the rack. Ensure
that you provide adequate ventilation for equipment at the bottom of the rack.
chassis. The best placement of the baffles depends on the airflow patterns in the rack. Experiment with
different arrangements to position the baffles effectively.
Installation Preparation
Online Only