Cisco SCE 1000 and Manual de inicio rápido - Página 6
Navegue en línea o descargue pdf Manual de inicio rápido para Hardware de red Cisco SCE 1000 and. Cisco SCE 1000 and 49 páginas. Service control engine 1000 2xgbe
Installing the Crossrail Supports (Four-post rack only)
This section provides information for assembling the crossrail supports and attaching them to the rack.
When mounting in a rack with four posts (front and back) the two crossrail supports are mounted one on each side of the rack.
The SCE 1000 then slides into these crossrails, which support the weight of the unit.
• Assemble the Crossrail Supports, page 6
• Attach the Crossrail Supports to the Rack, page 6
Assemble the Crossrail Supports
Assemble the two crossrail supports. Use three screws for each crossrail assembly.
Step 1
Figure 6
Assembling the Slider Brackets
1
Make sure that they are oriented so that both crossrails will support the SCE 1000 when they are attached to the rack.
Step 2
Attach the Crossrail Supports to the Rack
Align the crossrail supports with the side of the rack, parallel to the floor.
Step 1
Figure 7
Attaching the Crossrails to the Rack
Insert and tighten two screws to the front posts or mounting strips of the rack
Step 2
Insert and tighten two screws to the Back posts of the rack.
Step 3
Repeat steps 2 and 3 on the other side of the rack, keeping the brackets flush against the posts and parallel to the
Step 4
supporting bracket on first side of the rack.
6
2
3
1
2
3