Cisco UCS B260 M4 Nota de instalación y mantenimiento - Página 17
Navegue en línea o descargue pdf Nota de instalación y mantenimiento para Servidor Cisco UCS B260 M4. Cisco UCS B260 M4 46 páginas. Blade server
También para Cisco UCS B260 M4: Nota de instalación y mantenimiento (50 páginas)
Installing a Blade Server
This chapter contains the following sections:
•
•
•
•
•
Installing a Blade Server in the Chassis
If a UCS B460 M4 blade server is mixed with other full-width or half-width blades in the chassis, the UCS
B460 M4 blade servers must occupy the bottom two full-width slots in the chassis. The chassis should be
loaded with the largest server on the bottom, starting with a UCS B460 M4 blade server on the bottom,
followed by full-width blades above, and the half-width blades at the very top of the chassis.
Procedure
Step 1
If necessary, remove the slot divider from the chassis.
a) Simultaneously pull up on the left side catch and push down on the right side catch as shown in callout 1
of the following figure.
Installing a Blade Server in the Chassis, page 9
Server Configuration, page 11
Powering Off a Blade Server, page 12
Removing a Blade Server from the Chassis, page 12
Server Troubleshooting, page 13
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v4 CPUs
2
C H A P T E R
9