Ariston INTESA TP23 Manual del usuario, instrucciones de instalación y mantenimiento - Página 19
Navegue en línea o descargue pdf Manual del usuario, instrucciones de instalación y mantenimiento para Caldera Ariston INTESA TP23. Ariston INTESA TP23 50 páginas.
Installation
6.10
Control Panel
K J
I H G
F
C
A
B
L
:
EGEND
A - On/Off button
B - Central heating temperature adjustment
C - Domestic hot water temperature adjustment
D - Heating system pressure gauge
E - Time clock (knock out)
F - Central heating selector
G - Central heating L.E.D. (green)
H - Flue sensor L.E.D. (yellow)
I - Ignition failure (lockout) and/or overheat reset button
J - Overheat and/or ignition failure (lockout) L.E.D. (red)
)
K - ON/OFF L.E.D. (green
6.11
Removing the Front Panel
In order to access the inside of the boiler, it is necessary to
unscrew the fastening screws "A" of the control panel located on
the lower part of the panel itself.
The control panel moves downward and when pulled forward
rotates on two lateral hinges.
The panel stays in a semi-horizontal position, which allows
access to the inner parts of the boiler.
In order to increase the manoeuvering space, it is possible to
raise the control panel and rotate it to a fully horizontal position.
1
Supplied By www.heating spares.co Tel. 0161 620 6677
E
D
A
2
To dismantle the front casing panel it is necessary to:
1 - Remove the two screws "B";
2 - Move the front casing panel up and lift forward.
3
4
19
B