Zanussi ZHI 623 Manual de instalación, uso y mantenimiento - Página 7
Navegue en línea o descargue pdf Manual de instalación, uso y mantenimiento para Campana de ventilación Zanussi ZHI 623. Zanussi ZHI 623 15 páginas.
También para Zanussi ZHI 623: Manual de instalación, uso y mantenimiento (16 páginas)
2 - Loosen the hexagonal bolts for the
adjustment of the upper suspension hooks
(fig. 6), pull the hooks to the correct
dimension and retighten the bolts.
3 - Loosen the lower spacer plate support bolts
(fig. 7), pull it to the right dimension and
retighten the bolts. This square spacer plate
with built in unequal ribs can be reversed
depending on the required depth.
Auvent preparation
- This hood must be fitted with a facade similar
to that for the furniture in the kitchen and fixed
to the auvent (facade supplied by the furniture
installer).
1 - Fully open the auvent and press the locking
key at the front left inside (fig.5) to completely
remove theauvent.
2 - Drill the starter holes inside the facade using
the drilling template provided for this purpose.
3 - Place the auvent on the panel aligning the
holes and screw in using the screws provided.
Do not put it back on the hood before
installation on the wall.
Wall mounting
- Attach the hood by its suspension hooks to
the support lugs attached to the wall.
- To prevent accidental separation, drill and
attach the two safety brackets (supplied
with the appliance) to the wall so that they
bear on the suspension hooks.
- If necessary, adjust the alignment with the
adjacent furniture using the suspension
hook adjustment bolts (fig. 6).
Additional attachment to adjacent furniture
- Remove the filter support grillage and use the holes visible in the side walls to attach
to adjacent furniture. (The template supplied can be used before wall mounting).
5
6
7
7