Lenovo ThinkSystem SR650 Manual de inicio rápido - Página 11
Navegue en línea o descargue pdf Manual de inicio rápido para Servidor Lenovo ThinkSystem SR650. Lenovo ThinkSystem SR650 14 páginas. -48 v dc
Before installing a hot-swap power supply, touch the static-protective package that contains the new hot-
swap power supply to any unpainted surface on the outside of the server. Then, take the new hot-swap
power supply out of the package and place it on a static-protective surface.
To install a hot-swap power supply, complete the following steps:
Watch the procedure. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-A25P7vBoGa_wn7D7XTgDS_
• Youku:
http://list.youku.com/albumlist/show/id_50483444
Step 1.
If the server is in a rack, adjust the cable management arm (CMA) to gain access to the power
supply bay.
If you have installed the 2U CMA Upgrade Kit for Toolless Slide Rail or Toolless Slide Rail Kit with
2U CMA, do the following:
Figure 7. CMA adjustment
a. Press down the stop bracket
b. Rotate the CMA out of the way to gain access to the power supply bay.
1
and rotate it to the open position.
1 1 1 1