CAME ZL19N Manual de instalación - Página 5

Navegue en línea o descargue pdf Manual de instalación para Abrepuertas de garaje CAME ZL19N. CAME ZL19N 17 páginas. Control panel for 24v gearmotors

CAME ZL19N Manual de instalación

5.2 Tools and equipment

Make sure you have all the tools and materials needed to carry out the installation in total safety and in accordance with current
regulations. Here are some examples.

5.3 Anchoring and installing the box

1) Secure the base of the panel in a safe area; yes max. 6 mm
Head with to.
5) Snap the cover onto the hinges. Close it and secure it using the issued
screws.
Perforate the marked holes and insert the cable glands with corrugated tubes for the
electrical cables to run through.
Careful not to damage the electronic board inside the panel!!
Assemble the pressure hinges.
15 mm ~
the slide to rotate
After adjusting and setting, secure the cover using the issued screws.
4) insert the hinge into the housing (either left or
right) and secure them using the issued screws
and washers.