Diy Wake Drill Instrucciones de montaje - Página 3

Navegue en línea o descargue pdf Instrucciones de montaje para Altavoces Diy Wake Drill. Diy Wake Drill 5 páginas.

3. If you are installing coaxial’s make sure that you
place
the crossover on the foam ( figure 4 ) so
that the crossover sticks to the foam when it dries.
4. Install the binding posts ( figure 5 ).
5. Install the wire connectors on power leads
( figure 6 ).
6. Install the power leads to binding posts ( figure 7 ).
D iy wake
w w.diywake.com
w
A division of Pyramid Manufacturing.
916 Mann Ct. Folsom, Ca. 95630
Phone: (916)337-1324
Figure 4.
Figure 5.
Figure 6.
Figure 7.