Diy Wake Drill Montaj Talimatları - Sayfa 3
Konuşmacılar Diy Wake Drill için çevrimiçi göz atın veya pdf Montaj Talimatları indirin. Diy Wake Drill 5 sayfaları.
3. If you are installing coaxials make sure that you
place
the crossover on the foam ( figure 4 ) so
that the crossover sticks to the foam when it dries.
4. Install the binding posts ( figure 5 ).
5. Install the wire connectors on power leads
( figure 6 ).
6. Install the power leads to binding posts ( figure 7 ).
D iy wake
w w.diywake.com
w
A division of Pyramid Manufacturing.
916 Mann Ct. Folsom, Ca. 95630
Phone: (916)337-1324
Figure 4.
Figure 5.
Figure 6.
Figure 7.