AIO 2510-SXT Manual de instalación y puesta en marcha - Página 6
Navegue en línea o descargue pdf Manual de instalación y puesta en marcha para Sistema de agua AIO 2510-SXT. AIO 2510-SXT 7 páginas. Iron air charge
Media Loading Guide
Place the media tank on a level surface in an area with adequate ventilation. Proper
1.
precautions should be taken to cover your eyes, mouth and nose before pouring the media
into the tank.
After removing the control valve, center the riser tube in the tank and place the PVC cap on
2.
the riser to prevent media from entering the tube. It is important that the riser tube stays
properly centered in the tank as the media is installed.
Attach the plastic diffuser cone to the distributor tube
3.
(see right). In order to do this, swab PVC glue on the
distributor tube 4 inches below threads on the tank.
The diffuser cone can then be slipped over the
distributor and attached to this location. See Fig. 1 for
an idea of placement.
4. The Base Media layers are bagged and marked Media
1, Media 2 and Media 3. It is necessary to load the
tank beginning with the bag marked Media 1 (this is
Garnet) followed by the bag marked Media 2 (Filter
Sand), finally installing Media 3 (KDF‐85). For proper
operation of the system, the media must be properly
layered in the tank. Once the first three media layers
are installed, add the boxes marked BIRM to the tank.
Once the media has been installed, carefully assemble the valve to the tank. The riser tube
5.
must be properly centered in the valve and should not be forced as the valve is installed. The
check valve that is provided must be installed on the inlet of the unit.
Complete the installation process per local plumbing code.
6.
REV 070914
Page 5