BlueSky Mast 350G XL Series Hoja de referencia rápida - Página 3
Navegue en línea o descargue pdf Hoja de referencia rápida para Sistemas de elevación BlueSky Mast 350G XL Series. BlueSky Mast 350G XL Series 10 páginas.
También para BlueSky Mast 350G XL Series: Referencia rápida (10 páginas)

21
At a slight angle, drive stakes in
opposite directions into the re-
maining holes on the base plates.
26
Pay out the cable by turning the
winch handle counter clockwise.
31
Release the cam lock and raise
the mounting pole by turning the
winch clockwise.
36
Person #1 Locate the GUY LEADER with orange guy rope and clip it
into the Round Hole on the primary guy ring. Walk away from the mast
unwinding the guy leader rope until you reach the 15M mark.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2016 Allendale LLC All Rights Reserved
350G XL - Lift Series
Quick Reference Sheet - Primary & Secondary Guying
22
Locate the Lift Base Plate.
27
The cable should hang freely on
the left side of the winch and
should not go over anything.
1"
32
Raise the mounting pole until only
one inch is showing below the
cam lock.
DEPLOYMENT
23
Insert the lift base plate into the
bottom of the mounting pole.
28
Pass the cable through the two
rollers on the Lift Base Plate and
back up to the ball stop holder.
33
Lock the cam lock
37
Person #2 - Locate the four Large
Guy Stakes and Hammer and
follow behind person #1.
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
24
Locate the winch handle.
29
Pull the pin on the ball stop holder
opposite the winch. Insert the ball
stop and release the pin to secure.
34
Pin the Red Primary Guy Ring
BELOW your devices and allow
room for the guy ropes to clear.
38
Guy Stake #1 - At the 15M mark
drive a stake into the ground at a
slight angle.
25
Pull the pin on the winch and
insert the handle. Release the pin
to secure the handle.
30
Confirm the cable is taut and the
Lift Base Plate is secure.
35
Deploy Primary Guying
Four Guy Configuration
TWO PEOPLE
39
Guy Stake #2 - make sure it is
staked directly opposite and inline
with guy stake #1