Aktakom AMM-1081 Manuel d'utilisation - Page 13
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} Aktakom AMM-1081. Aktakom AMM-1081 20 pages. Smart multimeter
5-4 Voltage ( ACV/DCV ) measurement
1)Connect BLACK test lead into " COM " terminal ( 3-9,
Fig. 1 ).
2)Connect RED test lead into " V " terminal ( 3-8, Fig. 1 ).
3)Select the " Function switch " ( 3-7, Fig. 1 ) to
the " V " position.
4)Power On the meter by pressing the " Power On button "
( 3-2, Fig. 1 ) once, the Display will show " SMART ",
the meter is under " Smart " mode for voltage measurement.
5)The meter can measure the ACV, DCV value automatically
and with auto range selection.
5-5 Resistance measurement
1)Connect BLACK test lead into " COM " terminal ( 3-9,
Fig. 1 ).
2)Connect RED test lead into " Ω " terminal ( 3-8, Fig. 1 ).
3)Select the " Function switch " ( 3-7, Fig. 1 ) to
the " Ω " position.
4)Power On the meter by pressing the " Power On button "
( 3-2, Fig. 1 ) once, the Display will show " SMART ", the
meter is under " Smart " mode for resistance measurement.
5)The meter can measure the resistance value automatically
and with auto range selection.
5-6 Continuity, Diode measurement
Continuity measurement
1)Connect BLACK test lead into " COM " terminal ( 3-9,
Fig. 1 ).
2)Connect RED test lead into " Ω " terminal ( 3-8, Fig. 1 ).
3)Select the " Function switch " ( 3-7, Fig. 1 ) to
the "
" position.
4)Power On the meter by pressing the " Power On button "
( 3-2, Fig. 1 ) once, the Display will show " SMART ", the
meter is under " Smart " mode for Continuity measurement.
10
www.tmatlantic.com