American Standard 1662SG.221 Instructions d'installation - Page 3
Parcourez en ligne ou téléchargez le pdf Instructions d'installation pour {nom_de_la_catégorie} American Standard 1662SG.221. American Standard 1662SG.221 5 pages. Commercial shower system kits: 1.5 gpm & 2.5 gpm
5
INSTALLATION INSTRUCTIONS
The GRAB BAR (1) works best when secured to the wall studs or cross brace using WOOD SCREWS. If mounting
into the studs is not possible, use appropriate wall fasteners provided to secure the installation.
Mark a vertical center line in the location you wish to install the SLIDE BAR (1). NOTE: The height from the finished floor
is optional. See rough-in drawing for suggested dimensions.
Determine desired height from the finished floor to the lower support and mark a horizontal center line. Slide the two
WALL ESCUTCHEONS (5) away from the MOUNTING FLANGES (3). Position the GRAB BAR (1) as shown in Fig. A and
mark the location of the six mounting holes to be drilled. Fig. A. Using a #10 masonry drill, drill six mounting holes
1-1/4" max. deep. Fig. B.
Install the six ANCHORS (2) provided into the mounting holes. Use a hammer to lightly tap ANCHORS (2) into place.
Make sure they are installed flush against the finished wall. Fig. B.
Align and place the GRAB BAR MOUNTING FLANGES (3) over the installed ANCHORS (2). Secure the GRAB BAR (1)
to the wall with the SCREWS (4) provided. Fig. B.
Push WALL ESCUTCHEONS (5) against finished wall. Rotate WALL ESCUTCHEONS (5) clockwise to lock into
position. Fig. C.
Make sure larger diameter side of SPRAY HOLDER (6) is facing upward. If not rotate SPRAY HOLDER (6) 180 dergees.
Rotate the LEVER HANDLE (7) to the unlocked position. Push the SPRAY HOLDER (6) side onto the GRAB BAR (1).
Push the LEVER HANDLE SIDE (7) over the SPRAY HOLDER ARMS (8) until the two snap togerther.
Check operation of SLIDE BAR (1) by rotating HOLDER LEVER (7) and moving HAND SHOWER HOLDER (9) up and down.
Rotate LEVER HANDLE (7) back to lock HAND SHOWER HOLDER (6). Fig. B.
Fig. A
C/L
914mm
(36")
1
OPTIONAL TO FINISHED FLOOR
FINISHED
FLOOR
Fig. B
3
4
5
VERTICAL
CENTER LINE
1
LEVEL
5
USUALLY BETWEEN
915mm
1525mm
TO
(36")
(60")
2
DRILLED
MOUNTING
HOLES
LARGE
DIAMETER UP
6
Fig. C
1
8
LOCK
M 9 6 5 6 6 6 R ev. 1. 0 ( 1 / 17 )
ROTATE
CLOCKWISE
TO LOCK
5
UNLOCK
7