Dormakaba Package 04 Manuel d'instructions d'installation - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Dormakaba Package 04. Dormakaba Package 04 9 pages. Side load wood door and steel frame

dormakaba RTS88 Package 04 Installation Instructions
1.3 Prepare bottom of door, install bottom arm and floor bearing
Fig.3
Bottom rail
arm
1.3.1
Prepare bottom of door according to template.
1.3.2
Fasten bottom rail arm to door with five No. 14
flat head wood screws.
RTS88 Closers
Closer
Cover plate
Floor bearing
1.3.3
1.3.4
•
08280291
Prepare floor according to template.
Fasten floor bearing with three flat head wood
screws and plastic anchors.
Optional: see template for threshold
preparation.
Bottom of door
Bottom arm
Floor bearing
02-2020
5