Advance Appliances ECB 210 Manuel d'installation et d'utilisation - Page 15

Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} Advance Appliances ECB 210. Advance Appliances ECB 210 17 pages. Electric combination boiler

INSTALLER & COMMISSIONING ENGINEER DETAILS
Customer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
Installer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
DATE
..............................................................................
REGISTRATION DETAILS
(where applicable for unvented systems)
REG No.
......................................................................
ID SERIAL No. etc.
Commissioning Engineer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
DATE
..............................................................................
REGISTRATION DETAILS
(where applicable for unvented systems)
REG No.
......................................................................
ID SERIAL No. etc.
..........................................
..........................................
Servicing Requirements
1. Check pressure reducing valve
(if fitted) is 3.0 bar static and adjust
if necessary.
2. Check flow rates are correct at 18 litres
per minute. Clean filter in pressure
reducing valve only if required.
3. Check inhibitor levels in system
4 Check expansion vessel(s) are
appropriately charged.
5. Check blending valve output
temperature is 55°C or lower.
Should further assistance or clarification
be required contact Advance Advice on
01543 377723.
Failure to carry out annual service/
maintenance requirements and log proof
in service/maintenance records may
invalidate warranty.
Appliance Details
Manufacturer
Capacity
.......................................................................
Serial No.
...................................................................
General Installation
Has a check been done for joint
tightness and leaks?
Has a check been done for
electrical safety?
15
...........................................................
Yes
Yes
Litres
No
No