Advance Appliances ECB 210 설치 및 사용자 설명서 - 페이지 15
{카테고리_이름} Advance Appliances ECB 210에 대한 설치 및 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Advance Appliances ECB 210 17 페이지. Electric combination boiler
INSTALLER & COMMISSIONING ENGINEER DETAILS
Customer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
Installer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
DATE
..............................................................................
REGISTRATION DETAILS
(where applicable for unvented systems)
REG No.
......................................................................
ID SERIAL No. etc.
Commissioning Engineer Details
Name
.............................................................................
Address
.......................................................................
...............................................................................................
Tel No.
..........................................................................
DATE
..............................................................................
REGISTRATION DETAILS
(where applicable for unvented systems)
REG No.
......................................................................
ID SERIAL No. etc.
..........................................
..........................................
Servicing Requirements
1. Check pressure reducing valve
(if fitted) is 3.0 bar static and adjust
if necessary.
2. Check flow rates are correct at 18 litres
per minute. Clean filter in pressure
reducing valve only if required.
3. Check inhibitor levels in system
4 Check expansion vessel(s) are
appropriately charged.
5. Check blending valve output
temperature is 55°C or lower.
Should further assistance or clarification
be required contact Advance Advice on
01543 377723.
Failure to carry out annual service/
maintenance requirements and log proof
in service/maintenance records may
invalidate warranty.
Appliance Details
Manufacturer
Capacity
.......................................................................
Serial No.
...................................................................
General Installation
Has a check been done for joint
tightness and leaks?
Has a check been done for
electrical safety?
15
...........................................................
Yes
Yes
Litres
No
No