3. START AND USE
Positioning
The machine should be placed on a levelled concrete slab. This will en-
sure that the door which is also the primary shredder can be opened
easily. This will also prevent unnecessary stresses to the door hinges.
Electrical installation
Please consult a qualified individual for electrical installation. The drum
shredder, hammer mill and belt are interlocked so that the drum can-
not start before the hammer mill has been engaged. You have been
supplied with a single starter unit containing a 55kW & 15kW Star
delta and 1.5kW VSD. In the event that the 1.1kW bale conveyor this
will be included as a vsd.(Note that hydraulic model do not contain in-
verters in the starter panel). The overloads on these starters must
be set according to the motor FLC to prevent motor damage in the
event of overloading. Please note that a motor can still sustain dam-
age if started directly after an overheating event. The geared unit on
the belt and bale conveyor have a mounted forced cooling fan. These
fan ensures cooling at low frequency settings. These are may be con-
nected to start with the 55kW.
The rotation directions are as follows: When standing in front of the
hammer mill at the bale inlet chamber your hammer mill rotation
should be clockwise. The drum rotation should be upwards toward the
heavy duty counter bars. The starters must be placed in good view
and proximity of the machine operator. Please allow sufficient cable
length for opening the M100 Door (bale shredder) and 3m bale con-
veyor (If present).
Belt
Inspection
holes