DT DT SCREENS Dynamic 2S Manuel d'installation - Page 4
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} DT DT SCREENS Dynamic 2S. DT DT SCREENS Dynamic 2S 12 pages.
Unpacking
Each screen is carefully packaged in our factory to ensure that it reaches you in perfect condition.
Each section is wrapped in protective packaging or in a PVC sleeve to ensure it is protected and stays
clean.
Do not unpack each piece from its protective packaging until you are ready to install it. This
will ensure that you do not damage any of the velvet finished pieces accidentally during installation.
Note that the Dynamic 2s is designed to be assembled on the wall so that a clear floor area big
enough to build the screen is not required. However, it can also be built on the floor if preferred you
will just need to follow the same instructions but substitute the wall for the floor then lift and attach
the screen to the wall once built. DO NOT built the screen face down on the floor under any
circumstances as this will result damage to the screen and mechanism.
The screen is a 6-part frame. 2 end sections (containing the masking), 2 top sections and two bottom
sections. The bottom right section also houses the control box for the screen.
Frame Section Configuration Fig. 1
Dynamic 2S Installation Manual – V0.2
4