AIRTUG NFE-6 Instructions d'assemblage et d'utilisation - Page 6

Parcourez en ligne ou téléchargez le pdf Instructions d'assemblage et d'utilisation pour {nom_de_la_catégorie} AIRTUG NFE-6. AIRTUG NFE-6 8 pages.

www.airtug.com
6. Make sure the winch is in the locked position and winch the aircraft
onto the tug platform - ensure the nose-wheel / cowling is aligned with the
tug.
7. Tighten the winch until the NFE-4 attachment is secured into the
backstop.
8a. Raise the ramp so it is an inch or two off the ground (
Close the valve
and pump the jack handle for "up" operation and open the valve to lower the
platform)
8b. Ensure the winch is still tight.
Valve & Jack Handles
The tug is now ready to move the aircraft!
6