【LED Indicator】
The led indicator light on the front panel of product, the
function of each LED is described in the table as below.
LED system status
LED
Status
Description
Power is connected and operates
ON
properly.
PWR
Power is not connected or
OFF
operates abnormally.
ON
Port made effective connection
Link/ACT
Blinking
Port is inactive status
(G1~G5)
Port did not make effective
OFF
connection
【Installation】
Before installation, ensure that the work environment meets
the installation requirements, including the power needs and
abundant space. Whether it is close to the connection
equipment and other equipment are prepared or not.
1. Avoid in the sunshine, keep away from the heat
fountainhead or the area wherein intense EMI.
2. Check
the
cables
and
plugs
requirements.
3. Check whether the cables be seemly or not (less than
100m) according to the reasonable scheme.
4. Power: 12~48VDC
5. Environment: Working temperature: -40~75℃
Storage Temperature: -40~85℃
Relative humidity 5%~95%
DIN Rail Installation
In order to use in industrial environments expediently, the
product adopts 35mm DIN-Rail installation, the installation
steps are shown as follows:
1.
Examine the DIN-Rail attachment
2.
Examine DIN Rail whether be firm and the position is
suitability or not.
3.
Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4.
The DIN-Rail attachment unit will snap into place as
shown below.
Wiring Requirements
Cable laying needs to meet the following requirements,
1. It is needed to check whether the type, quantity, and
specification of cable match the requirement before
cable laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable
laying;
that
installation
3. The required cable specification, quantity, direction and
laying position need to match construction requirements,
and cable length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turn;
6. Cable should be straight in the groove, and cannot
beyond the groove in case of holding back the inlet and
outlet holes. Cables should be banned and fixed when
they are out of the groove;
7. User cable should be separated from the power lines.
Cables, power lines, and grounding lines cannot be
overlapped and mixed when they are in the same groove
road. When cable is too long, it cannot hold down
another cable, but structure in the middle of alignment
- 3 -
rack;
8. Pigtail cannot be tied and served as less as possible.
Swerving radius cannot be too small (small swerving
causes terrible loss of link). It's banding should be
moderate, not too tight, and should be separated from
other cables;
9. It should have corresponding simple signal at both sides
of the cable for maintaining.
【Specification】
Technology
Standard:
IEEE802.3,
IEEE802.3u,
IEEE802.3ab
Flow control: IEEE802.3x flow control, back press flow
control
Exchange Attribute
100M forward speed: 148810pps
1000M forward speed: 1488100pps
100M maximum filter speed: 148810pps
1000M maximum filter speed: 1488100pps
Transmit mode: store and forward
System exchange bandwidth: 14G
MAC address table: 8K
Memory: 1Mbit
Interface
Electric port: 10/100/1000Base-T(X) auto negotiation speed,
Full/Half duplex mode, auto MDI/MDI-X connection, and
RJ45 connector.
Transfer Distance
Twisted cable: 100M (standard CAT5/CAT5e cable)
LED Indicator
Interface indicators: Link/ACT (1~5)
Power Indicator: PWR
Power Supply
Input voltage: 12~48VDC
Type of input: 3-pin 7.62mm pitch terminal block
IEEE802.3x,