danew E135 Manuel de l'utilisateur - Page 7

Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} danew E135. danew E135 19 pages. All road gps

2.2

Installation on a Motorcycle

Install the U-Bolt ,Holder and Handlebar
base:
1. Place the U-Bolt and the holder around
the handlebar, and thread the ends
through the handlebar base. (Photo
3-1)
2. Tighten the bolts to secure the base.
Do not over tighten.
Photo 3-1
Fix the double–socket arm to knob:
Attach the Base Plate to the E135 Mount
.
1. Thread the bolt through double-socket
arm to knob. (Photo 3-3)
Photo 3-4
7
Photo 3-3