danew E135 사용자 설명서 - 페이지 7
{카테고리_이름} danew E135에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. danew E135 19 페이지. All road gps
2.2
Installation on a Motorcycle
Install the U-Bolt ,Holder and Handlebar
base:
1. Place the U-Bolt and the holder around
the handlebar, and thread the ends
through the handlebar base. (Photo
3-1)
2. Tighten the bolts to secure the base.
Do not over tighten.
Photo 3-1
Fix the double–socket arm to knob:
Attach the Base Plate to the E135 Mount
.
1. Thread the bolt through double-socket
arm to knob. (Photo 3-3)
Photo 3-4
7
Photo 3-3