Dankoff Solar Water Feature Manuel d'installation et d'entretien - Page 13

Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'entretien pour {nom_de_la_catégorie} Dankoff Solar Water Feature. Dankoff Solar Water Feature 18 pages. Solution kit

13

6. STARTING THE SYSTEM

Before You Begin
The breaker inside the disconnect switch should remain 'off' until the system has been primed and there is enough
sunlight to run the system.
Prime the System with Water
Priming a pump means filling its intake pipe completely with water and must be done if the pump is mounted
higher than the water source.
Prime the pump by removing the inlet hose at the pump intake and pour water into the opening until it is
completely full. The foot valve keeps the pump primed by preventing water from back flowing into the water source.
Replace the inlet hose onto the pump intake.
Power on the System
Flip the breaker inside the disconnect switch to the 'on' position. If there is enough sunlight, the pump should start
moving water within a few seconds. As sunlight fades the pump will spin more slowly until it stops. The reverse will
happen as the sun rises and as soon as there is enough current the pump will begin to spin. There is no need to
turn the pump on/off each day.