Afag IRG 1-MS Traduction du mode d'emploi original - Page 7
Parcourez en ligne ou téléchargez le pdf Traduction du mode d'emploi original pour {nom_de_la_catégorie} Afag IRG 1-MS. Afag IRG 1-MS 11 pages.
3 Description of the device
3.1 General
Control module for 1-phase capacitor motors
The module can be switched on or off from a higher-level system e.g. "SMART-Box"
or PLC via an enable input (M8) with a 24V, DC signal.
For test purposes, the enable can be bypassed internally by a switch. The status of
the output is indicated by an LED on the front panel.
Miniature magnets can also be operated safely at the IRG 1-S con-
troller!
In the case of applications that require the oscillation conveyor to
be switched ON and OFF constantly (e.g. dust switching, hopper
control system, etc.), the prescribed controller input must be
used. If the load circuit is disconnected with a switch or a relay
the controller may be damaged.
If the controller is switched on, never insert or remove the plug at
the vibration conveyor being operated. This can damage the ap-
pliance.
Repair work must be carried out by qualified personnel only. We
recommend that repairs are carried out on our premises.
Release: 1.1
NOTE
CAUTION
NOTE
2014-11-12
Page 7