DataStor Compaq Proliant Ultra2 SCSI III Manuel d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} DataStor Compaq Proliant Ultra2 SCSI III. DataStor Compaq Proliant Ultra2 SCSI III 2 pages. 80pin hot plug tray

Connect Tray Cables to Drive
NOTE: Please reference the documentation that came with your
hard drive for identification of proper connections on your drive.
1. Connect the HD 68pin I/O cable from the tray to the back of
the drive.
2. Connect the four-pin power connector to the back of the drive.
3. Connect the SCSI/Activity Jumper connector to the rear of
the drive. Orient the connector so that Pin 1 (The Red Wire
on the connector) orients with Pin 1 on the rear of your drive.
Normally, Pin 1 is the upper-right most pin on the rear of the
drive, and may be labeled "Pin 1", "A0", "ID 1", "1-Signal" etc.
(See Figure 3 for Sample Configuration)
4. Referencing the documentation that came with your
drive, be sure to Disable any automatic or passive drive
termination features on the drive itself.
NOTE: If you are unable to match the SCSI/Activity Jumper
connector to the drive, than your drive is NOT compatible with
this model of Compaq
Select and Attach Cover Grill to Tray
1. Select and attach the appropriate cover grill to your tray. This
selection will depend on the format of drive you are using as
well as your current Proliant
2. The cover grill attaches by inserting the four feet on the bottom of the cover through the Tray Cover Slots
(Figure 2) and then sliding the cover forward so that the front, beveled part of the cover is flush with the
beveled portion of the tray.
3. The cover can be further secured by mounting two screws through the side mounting holes on the sides of
the cover to the appropriate mounting holes in your drive, if available.
Insert Tray into Receiving Cage
1. Referencing Figure Four, apply pressure between your thumb and forefinger on the tray release levers on
the front of the tray. This should allow the levers to swing out, thus allowing you to slide the tray into the
receiver on your server.
2. Gently slide the tray into the receiver until you feel the PCB connector on the back of the tray touch the
connector.
3. Rotate the Release Levers back into the locked position. You should hear and feel a click when the levers
lock into place. This should force the tray completely into the receiver connector and snugly lock the tray into
the server.
DataStor, 12601 Monarch Street, Garden Grove, CA 92841-3918
Phone (800) 777-6621 / Fax: (714)833-9600 / Web Site: www.dstor.com
Installation Guide - Hot Plug Tray, HD 68pin, Compaq Proliant , Rev 1.0 - March 1999 - P/N CQPTUWS
Copyright 1999 by DataStor, Inc. All rights reserved. No part of this document may be reproduced in any form without prior written consent from DataStor. The information and specifications in this document are subject to change
without notice. Changes to this document are incorporated in new versions. DataStor, and the DataStor logo are reqistered trademarks of DataStor, Inc. Other trademarks used herein are the property of their respective owners.
®
Proliant
TM
.
TM
tray receiver configuration.
Compaq
®
and Proliant
TM
are both Trade Marks of Compaq Computer Corporation.
This document was printed in the United States Of America.
SCSI/Activity Jumper
Figure 3
Tray SCSI
Activity
Pin 1 (Red Wire)
Connector
Drive Jumper Block
Figure 4
Tray Release Levers
Close-Up View
Figure 7
Configuration