AFG 2.0AS Assembly and Manuel d'assemblage et d'utilisation - Page 7
Parcourez en ligne ou téléchargez le pdf Manuel d'assemblage et d'utilisation pour {nom_de_la_catégorie} AFG 2.0AS Assembly and. AFG 2.0AS Assembly and 16 pages. Afg series
Également pour AFG 2.0AS Assembly and : Manuel d'assemblage et d'utilisation (15 pages)
iI_ ii_i
i
_
i i
i I
ii ¸ _
il_ _ iii_i
_i _i! I_ i i_ i i_!!_i
_
i
ii
2.0 AS rev 1.2.indd
12-13
A
B
C
D
E
F
G
H
FLAT WASHER ( C)
Qty:8
(_
YLON
NUT(E)
Qty:4
BOLT (0)
lOOmm
Qty:2
FLAT WASHER (I)
Qty:4
_
YLON
NUT(K)
Qty:2
BOLT (P)
_70mm
_)
Qty:2
RUBBER
BUMPER
Qty:2
BOLT (Q)
40 mrn
Qty:2
OpenHARDWARE B AG5.
UPPER MOUNTING BRACKET
Attach LOWER MOUNTING B RACKET (after
removingpre-installedguide rod bolts) to BASE
FRAME in desiredlocation, using 2 BOLTS (P), 4
FLATWASHERS (C) and 2 NYLON NUTS (E).
NOTE: Referto page 25 for mountingpositions.
Position each GUIDERODso that the mounting
holes are in the upper position, and insert
GUIDERODSinto corresponding sleeves in
LOWERMOUNTING BRACKET
Slide ] RUBBER BUMPERonto each guide rod,
as shown in diagram.
........ y
UPPER
PULLEY
ASSEMBLY
BOLT ( Q)
/
\ FLAT
WASHER (J)
--BAYONET
WEIGHT
PLATES
Install each WEIGHT P LATE ontoguide rod as
shownin diagram. Ensurethan the weightpin
selectorslot is positioneddownwardand in
samedirection.
Install BAYONET onto GUIDERODSas shown in
diagram.
Re-install GUIDE ROD bolts into LOWER
MOUNTING B RACKET
Instafl UPPERMOUNTING BRACKET to top of
GUIDERODS,as shown in diagram, using 2
BOLTS(Q), 4 FLATWASHERS (I), and 2 NYLON
NUTS ( g).
BASEFRAME
RUBBER
BUMPER
\
LOWERMOUNTING
BRACKET
FLAT WASHER (C)
NYLON NUT (E)
Attach UPPER MOUNTING B RACKET t o UPPER PULLEY ASSEMBLY u sing 2 BOLTS (0), 4
FLATWASHERS(C),and 2 NYLONNUTS (E).
NOTE: Ensurethat the UPPER MOUNTING B RACKET's positioncorresponds to the position
of the LOWER MOUNTING B RACKET beforesecuringit to the UPPER PULLEY A SSEMBLY.
]
Tighten all hardware.
CABLE A
Qty:1
DUALFLOATING
PULLEY BRACKET
SINGLE F LOATING
PULLEY BRACKET
\
BAYONET
CABLE A
WEIGHT SELECTION
PIN TETHER
BAYONET
A
Open HARDWARE BAG B.
B Install SINGLEFLOATINGPULLEY
BRACKET onto one end ofCABLEA.
C
D
E
Remove THREADED SCREWand NUT
from other end of CABLEA.
Route CABLEA through pulleys as
shown in diagram.
NOTE:DUALFLOATING PULLEY
BRACKET must be installed after
CABLEA is routed through first pulley.
After CABLE A routing is complete,
instafl THREADED SCREW and NUT
onto cable endand threadthrough
WEIGHT S ELECTION PINtether into
BAYONET
NOTE: Alwaysmaintain at least 1/2"
of CABLE A SCREW threadedinto
BAYONET f or safety.
i
iiii
i
12/28/07
10:16:21
AM