Automationdirect.com Productivity 2000 P2-07B Manuel - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Automationdirect.com Productivity 2000 P2-07B. Automationdirect.com Productivity 2000 P2-07B 8 pages. Base

Automationdirect.com Productivity 2000 P2-07B Manuel

DIN Rail Installation

Using Mounting Rails
The Productivity2000 bases can be secured to the cabinet using
mounting rails. You should use rails that conform to DIN EN
standard 50 022. Refer to our catalog for a complete line of DIN
rail, DINnectors and DIN rail mounted apparatus. These rails are
approximately 35mm high, with a depth of 7.5mm. If you mount the
base on a rail, you should also consider using end brackets on each
end of the rail. The end brackets help keep the base from sliding
horizontally along the rail. This helps minimize the possibility of
accidentally pulling the wiring loose.
If you examine the bottom of the base, you'll notice retaining
clips. To secure the base to a DIN rail, place the base onto the rail
and gently push up on the retaining clips. The clips lock the base
onto the rail.
To remove the base, pull down on the retaining clips, slightly
lift up the base, and pull it away from the rail.
End Bracket (Part No. DN-EB35)
DIN Rail (Part No. DN-R35S1)
6
www.productivity2000.com
2
Rotate base
into position.
DIN Rail
Dimensions
7.5 mm
35 mm
Hook base
1
onto DIN rail at
top of mount-
ing slot.
3
Retaining Clips
Tech Support 770-844-4200
Gently push up
retaining clips.