DYNAVAC NovaDryer-DHF600 Manuel d'installation et d'utilisation rapide - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation rapide pour {nom_de_la_catégorie} DYNAVAC NovaDryer-DHF600. DYNAVAC NovaDryer-DHF600 17 pages. Vacuum freeze dryer

Part 2. Preparation before operation
1. Find power cord, metal soft vacuum tube, and connectors. Connect the vacuum pump to the
freeze dryer(Pic‐2 & 3)
2. Vacuum pump oil:
2‐1. Please find vacuum pump oil inside the package.
2‐2. Add it into the vacuum pump to the oil level or 2/3 position of the side window.
2‐3.  If the freeze dryer is shipped by air, vacuum pump  oil is  removed before shipment according to civil
aviation security regulation. Please purchase vacuum pump oil (#100 or #68 for vacuum pump 2XZ‐2/4 and
#46 or #68 for vacuum pump DRV‐10) for any brand locally. Mobil and Shell are recommended.
2‐4.  Vacuum  pump  oil  is  consumable  and  needs  to  be  replaced  after  running  for  100‐200  hours,  please
prepare some vacuum pump oil for spare use.
2‐5. Vacuum pump oil can be recycled after frozen and sedimentation so as to save cost. For details, please
contact us.
3. Connect the freeze dryer to proper power supply (220V/50Hz, 220V/60Hz or 110V/60Hz) as marked on the label on the
side of the freeze dryer.
4. Open the door, load the trays onto the rack.
5. External temperature sensor:
Insert the sensor into the materials so as to detect material temperature during freeze drying.
6. Close the door. Check and make sure there is no air leakage with the vacuum tube, connectors and door
www.dynapumps.com.au • 1300 788 579 • [email protected]
Pic‐6
Pic‐8
Pic‐10
2/3 Position 
Pic‐7     
Pic‐9
Pic‐11