DYNAVAC NovaDryer-DHF600 Panduan Pemasangan & Pengoperasian Cepat - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian Cepat untuk Pengering DYNAVAC NovaDryer-DHF600. DYNAVAC NovaDryer-DHF600 17 halaman. Vacuum freeze dryer
Part 2. Preparation before operation
1. Find power cord, metal soft vacuum tube, and connectors. Connect the vacuum pump to the
freeze dryer(Pic‐2 & 3)
2. Vacuum pump oil:
2‐1. Please find vacuum pump oil inside the package.
2‐2. Add it into the vacuum pump to the oil level or 2/3 position of the side window.
2‐3. If the freeze dryer is shipped by air, vacuum pump oil is removed before shipment according to civil
aviation security regulation. Please purchase vacuum pump oil (#100 or #68 for vacuum pump 2XZ‐2/4 and
#46 or #68 for vacuum pump DRV‐10) for any brand locally. Mobil and Shell are recommended.
2‐4. Vacuum pump oil is consumable and needs to be replaced after running for 100‐200 hours, please
prepare some vacuum pump oil for spare use.
2‐5. Vacuum pump oil can be recycled after frozen and sedimentation so as to save cost. For details, please
contact us.
3. Connect the freeze dryer to proper power supply (220V/50Hz, 220V/60Hz or 110V/60Hz) as marked on the label on the
side of the freeze dryer.
4. Open the door, load the trays onto the rack.
5. External temperature sensor:
Insert the sensor into the materials so as to detect material temperature during freeze drying.
6. Close the door. Check and make sure there is no air leakage with the vacuum tube, connectors and door
www.dynapumps.com.au • 1300 788 579 • [email protected]
Pic‐6
Pic‐8
Pic‐10
2/3 Position
Pic‐7
Pic‐9
Pic‐11