AgSense CROP-LINK Instructions de câblage - Page 4

Parcourez en ligne ou téléchargez le pdf Instructions de câblage pour {nom_de_la_catégorie} AgSense CROP-LINK. AgSense CROP-LINK 10 pages. 2012 - 14 soil moisture monitoring
Également pour AgSense CROP-LINK : Instructions de câblage (8 pages)

Wiring the Solar Panel to the Crop Link Unit
Wiring the solar panel: Find the last two terminals on the large terminal strip labeled DC/SOL
1. Connect the Black Wire (-) from the solar panel to the terminal marked GND as shown
above.
2. Connect the Red Wire (+) from the solar panel to the terminal marked DC/SOL as shown
above.
and GND