AgSense CROP-LINK Bedradingsinstructies - Pagina 4

Blader online of download pdf Bedradingsinstructies voor {categorie_naam} AgSense CROP-LINK. AgSense CROP-LINK 10 pagina's. 2012 - 14 soil moisture monitoring
Ook voor AgSense CROP-LINK: Bedradingsinstructies (8 pagina's)

Wiring the Solar Panel to the Crop Link Unit
Wiring the solar panel: Find the last two terminals on the large terminal strip labeled DC/SOL
1. Connect the Black Wire (-) from the solar panel to the terminal marked GND as shown
above.
2. Connect the Red Wire (+) from the solar panel to the terminal marked DC/SOL as shown
above.
and GND