Gree NRQD16G/A-S Manuel du propriétaire - Page 10

Parcourez en ligne ou téléchargez le pdf Manuel du propriétaire pour {nom_de_la_catégorie} Gree NRQD16G/A-S. Gree NRQD16G/A-S 19 pages. Hot water converter of gmv5 home

Gree NRQD16G/A-S Manuel du propriétaire
Notes:
① Conduct thermal insulation for refrigerant copper tube; in order to ensure the using effect, thickness of
thermal insulating material should not be less than 8mm.
② Make sure that the refrigerant copper tube is sealed up without leakage.
5.1.5 Installation Requirements for Water System
(1) Connect cooling water inlet of pressure bearing water tank to tap water pipe, connect
hot water outlet to terminal water using outlet.
(2) Tap water inlet should connect to one-way valve and filter.
(3) For easy maintenance, water inlet and water outlet should be installed with manual
cut-off valve.
(4) Install air release valve in the highest point of water pipe.
5.1.6 Installation Method of Hot Water Converter
Wall-mounted installation:
(1) Install wall-mounted board
Notes:
① Use line aligning method or leveling instrument to find the level position;
② Use screws to fix the wall-mounted board on the wall after being processed (such as be embedded with
plastic particles);
③ After installing the board, check if it is firmly installed.
(2) Hang the hot water converter on the wall-mounted board
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Hot water converter of GMV5 Home Installation and Operation Manual
Fig. 5.3
7