Airflow 200G-XX Manuel du propriétaire - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel du propriétaire pour {nom_de_la_catégorie} Airflow 200G-XX. Airflow 200G-XX 12 pages. Builder’s choice gallery edition

Unpacking
Before assembling and installing your ceiling fan, remove all
parts from the shipping cartons and check them against the
parts listed here. Before discarding packaging material, be
certain that all parts have been removed.
Be sure to only use genuine Airflow blades. The blade shrink
wrap holds five blades of matched weight. If more than one
fan is being installed, be sure not to mix blade sets.
ALLEN SET SCREW
1
-20 x
1
"
4
4
(PRE-INSTALLED)
Prepare for fan installation as follows:
Step 4. Route the wires from the motor through the canopy,
then the Perma • Lock™ downrod and ball assembly.
TIP: The downrod has a tapered thread
that is designed to lock completely when
correctly installed.
Step 5. Using the provided Allen wrench, loosen the set screw
several turns to allow installation of the downrod. Thread the
downrod into the motor coupling until it stops turning, this
will take at least four and a half full turns.
Step 6. Securely tighten the set screw with the provided Allen
wrench to ensure safe operation of your fan.
CAUTION: Failure to fully lock in the down-
rod before securely tightening the allen set
screw may cause the fan to separate from
the downrod during normal operation!

GETTING STARTED

NOTE: Only one set of blade holders is supplied. Depending on
the fans and series, there are three different mounting
procedures.
FAN INSTALLATION
PERMA • LOCK™ HARDWARE
3mm
ALLEN WRENCH
FAN PREPARATION
CAUTION: When removing the shrink wrap,
be careful not to scratch the blades.
GROUND
WIRE
TAPERED
THREAD
ALLEN
SET SCREW
B
'
C
UILDER
S
HOICE
G
E
ALLERY
DITION
DOWNROD & BALL
ASSEMBLY
MOTOR
WIRES
BLUE
D1
WIRE
CANOPY
DOWNROD
MOTOR
COUPLING
3