Gamma 6004 Manuel du propriétaire - Page 12

Parcourez en ligne ou téléchargez le pdf Manuel du propriétaire pour {nom_de_la_catégorie} Gamma 6004. Gamma 6004 20 pages. 6 point mounting
Également pour Gamma 6004 : Manuel du propriétaire (20 pages), Manuel du propriétaire (20 pages), Manuel du propriétaire (19 pages)

Gamma 6004 Manuel du propriétaire
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the main strings being careful to alternate the weave
direction of each consecutive cross string so as to be opposite of the previously installed
cross string.
Once the fi nal cross string is tensioned and clamped, tie off at the appropriate hole specifi ed
by the racquet manufacturer. Remove the frame from the mounting system by loosening the
shoulder supports and frame supports.
Pulling Tension
Wrap the loose section of string once around
the roller and insert the string between the
diamond dust coated string gripper plates.
Pull the string perpendicular to the gripper
plates while slowly rotating the tensioner
crank clockwise until the brake lever pops
out of the latching block. The string is now
tensioned and can be clamped in place with
the remaining fi xed clamp.
Repeat the above steps until all main strings
are installed. Tie off ends of main strings as
per racquet manufacturers recommenda-
tions.
Clamping the First Main String
Secure the tensioned main string using the
remaining fi xed clamp. Repeat the procedure
for all of the remaining main strings and tie off
following the racquet manufacturers recom-
mendations.
Follow the manufacturers recommended
stringing pattern for one or two piece stringing.
This will determine the starting point for the
cross strings. If applicable, tie the fi rst cross
string using an appropriate starting knot.
12