Green motion PIPISTREL SKYCHARGE Manuel de documentation technique - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel de documentation technique pour {nom_de_la_catégorie} Green motion PIPISTREL SKYCHARGE. Green motion PIPISTREL SKYCHARGE 17 pages.
Également pour Green motion PIPISTREL SKYCHARGE : Manuel de documentation technique (15 pages)
SKYCHARGE – TECHNICAL DOCUMENTATION
2.2
Wiring
Connect the station to the electrical panel with the following protections:
Model
Input voltage
Input current
Power cable min cross section 1
Power supply terminal block max section
Circuit breaker at panel 2
Please be sure to install a RCD device after the C40 breaker.
Green Motion strongly recommends using a Doepke RCCB DFS 4 040-4/0.03-A EV R as an RCD device or Eaton
167897 FRCDM-40/4/03-G/B.
1)
These sections must be re-assessed by the installer according to the length.
2)
The Installer must define the types of Circuit breaker.
3)
The circuit breakers at panel of 40 A and the power cable minimal cross section of 10 mm
in order to ensure the functioning of the charging station with a temperature increase.
NOTE FOR SWITZERLAND
● The NIBT standard does not requires DC terminals to be protected against direct fault currents.
Page 6
22 kW
400 V
AC
32 A
rms
2
5 x 10 mm
2
16 mm
C40
2
is overvalued