Green motion PIPISTREL SKYCHARGE Manuel de documentation technique - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel de documentation technique pour {nom_de_la_catégorie} Green motion PIPISTREL SKYCHARGE. Green motion PIPISTREL SKYCHARGE 15 pages.
Également pour Green motion PIPISTREL SKYCHARGE : Manuel de documentation technique (17 pages)
SKYCHARGE Mobile – TECHNICAL DOCUMENTATION
Page 6
3 COMMISSIONING
The opening of the charger as well as any configuration changes must be carried out by a qualified electrician
according to the local safety and electrical regulations and laws. Failure to comply with the regulations in this
manual will result in the end the warranty period.
Electric shock hazard! Any operation requiring opening of the main converter box can lead to electric shock
hazards. Please make sure to carefully read instructions. In case of a doubt, please immediately contact Green
Motion support.
3.1 Opening the SKYCHARGE Mobile casing
Use a TR20 screwdriver to unscrew the 2 screws located on the top and the bottom right side of the SKYCHARGE
Mobile front door. The front door can be opened sideway.
Electric shock hazard! In case of an operation on the power converter, the operators shall disconnect the MCB
and wait for at least 5min. Before opening the door, operators shall ensure absence of voltage on the DC-link
capacitors.