Green motion PIPISTREL SKYCHARGE 기술 문서 매뉴얼 - 페이지 6

{카테고리_이름} Green motion PIPISTREL SKYCHARGE에 대한 기술 문서 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Green motion PIPISTREL SKYCHARGE 15 페이지.
Green motion PIPISTREL SKYCHARGE에 대해서도 마찬가지입니다: 기술 문서 매뉴얼 (17 페이지)

Green motion PIPISTREL SKYCHARGE 기술 문서 매뉴얼
SKYCHARGE Mobile – TECHNICAL DOCUMENTATION
Page 6

3 COMMISSIONING

The opening of the charger as well as any configuration changes must be carried out by a qualified electrician
according to the local safety and electrical regulations and laws. Failure to comply with the regulations in this
manual will result in the end the warranty period.
Electric shock hazard! Any operation requiring opening of the main converter box can lead to electric shock
hazards. Please make sure to carefully read instructions. In case of a doubt, please immediately contact Green
Motion support.

3.1 Opening the SKYCHARGE Mobile casing

Use a TR20 screwdriver to unscrew the 2 screws located on the top and the bottom right side of the SKYCHARGE
Mobile front door. The front door can be opened sideway.
Electric shock hazard! In case of an operation on the power converter, the operators shall disconnect the MCB
and wait for at least 5min. Before opening the door, operators shall ensure absence of voltage on the DC-link
capacitors.