BERNHARDT design a.k.a. C-base Manuel d'instructions - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions pour {nom_de_la_catégorie} BERNHARDT design a.k.a. C-base. BERNHARDT design a.k.a. C-base 20 pages.

BERNHARDT design a.k.a. C-base Manuel d'instructions
a
IMPORTANT NOTES
Failure to install product according to installation instruction will result in loss of warranty.
Tools required for assembly of workwalls:
Tape measure
48" to 60" Level
Cordless drill w/ driver & drill bits
Rubber mallet
Wood leveling shims
Laser level
Suggested Fasteners for Workwall Structure connection to the wall:
Toggler® Snaptoggle® or similar high performance anchors — we suggest you use the ¼"– 20 bolt version for added flexibility.
Workwall Installation
September 2012
Step 1
Identify the highest point of the floor along the intended
mounting wall. The highest point can be found by
projecting a laser level on the wall and measuring the
distance from the floor to the line. The smaller dimension is
the highest point of the floor.
Step 2
Mark stud locations on the intended mounting wall.
Additional anchoring to the studs is required
during installation.
a.k.a. workwall installation